Energy-Efficient Rehabilitation Project
In 2013/14 the SEB LU built a new environmentally-friendly heating, cooling and ventilation system and replaced the entire wiring system and lights in all Faculty areas. As shown in Figure 1, energy consumption for heating and consumption of electricity was notably reduced in the period 2014-2017 in comparison to 2013 as a result of all the improvements. As shown in Figure 2, the SEB LU lowered its heating and electricity costs in the period 2014-2017 by more than 100.000 EUR per year, compared to 2013.
Figure 1: Consumption of energy for heating and consumption of electricity (in MWh) in the period 2013-2017
Figure 2: Total heating and electricity costs (in EUR) in the period 2013-2017